"The ROD represents the blue print for the remediation. The clean-up will cost $506 million, last 8 to 10 years and will include dredging of the toxic material, caping, controls to reduce sources of contamination from uplands, as well as removal of contamination from the 1st Street Basin. Most importantly, the ROD will address and control the flow of contaminated sewage solids from the Combined Sewer Overflow. The EPA is requiring that discharges from two major outflows be captured in retention basins . This will reduce CSOs in the canal by an estimated 58 to 74%."
Typos courtesy of my iPhone
No comments:
Post a Comment